Already Unwrapping
Nov 10, 2023
It’s not Christmas yet, but there is still some unwrapping underway!
This indoor tennis pavilion was installed fully wrapped, except for the connections. It is important to cut openings in the bottom of the wrap to allow any water which might get inside to drain. Some installers will leave all of the wrapping on the beams during installation and some take it off. Either way, you want to make sure you are consistent with all members so they all get the same amount of UV exposure.
Here is the building during the decking installation and unwrapping of the glulam beams and arches.