Unalam

Glulam Pre-Assembly Nearly Done on Groton St. Bridge

Now that we have added the roof trusses to the top of the Groton St. Bridge it won’t be long before we have to disassemble it and ship everything to Pepperell, MA for final installation.

These photos show some of the more recent progress. The first shows the roof truss being carefully installed on top of the bridge side trusses. The second and third photos show the bridge with all roof trusses installed.

Unalam is looking for new team members

We offer a generous benefit package, including health and dental insurance and an employer matcher 401k. Our positive business philosophy creates a fun work environment for all employees.

APPLY TODAY

Ready to get started on your project?

Get a Quote